Improvement of the quality and safety of cross-border railway connections by works on the line No. 101 in Werchrata and at Lviv railway station
Rail-UP

Improvement of the quality and safety of cross-border railway connections by works on the line No. 101 in Werchrata and at Lviv railway station

27.01.2026

priority

Borders

specific objective

5.1 Other actions to contribute to a safer and more secure Europe

Lead partner

PKP Polskie Linie Kolejowe S.A. (Mazowieckie Voivodeship, Poland)

Partners

JSC Ukrainian Railways (Kyiv Oblast, Ukraine)

Czas trwania

30 months

01.01.2026 - 30.06.2028


The Rail-UP project responds to transport challenges caused by the ongoing war, which has shifted travel needs and increased passenger and freight flows, thereby creating an urgent need to upgrade existing infrastructure. Its main objective is to modernise railway infrastructure and ensure barrier-free access for people with reduced mobility at Lviv railway station, supporting Ukraine’s European integration through the implementation of EU standards on accessibility and inclusive railway infrastructure.

On the Polish side, the project will upgrade the deteriorating infrastructure of line no. 101, last substantially renovated in 1975. Nearly 4 km of track will be replaced, increasing speed from 30 to 70 km/h. The project also includes renewal of the track surface at Werchrata station, replacement of the road surface and modernisation of a level crossing, refurbishment of three culverts, as well as one rail viaduct, and one rail bridge.

On the Ukrainian side, the project focuses on improving services at border crossings, particularly at Lviv railway station, which functions as a key logistics hub. The station currently lacks inclusive infrastructure, limiting access for persons with disabilities, elderly passengers, and others with special needs. Passenger numbers increased to over 3.1 million in 2024, with assistance requests increasing 2.5 times. Within the project, the 2nd passenger platform will be reconstructed to be fully accessible through the installation of two elevators, two escalators, two ramps, and staircases.

The project also strengthens cooperation among Polish and Ukrainian managers, railway operators, and border control guards through five planned workshops and targeted training programmes, which will bring an opportunity to exchange knowledge and experience.

Overall, the Rail-UP project will benefit approximately 3 million passengers annually, including vulnerable groups such as evacuees, injured military personnel, and persons with disabilities. By increasing speeds and improving infrastructure quality, the project will enhance capacity, reliability, and border crossing efficiency, while providing an alternative to roads, routes and strengthening the resilience of the railway system. The final result will be improved safety, better-quality services and more efficient cross-border transport in the border area.

See other projects

Improvement of the quality and safety of cross-border railway connections by works on the line No. 101 in Werchrata and at Lviv railway station

Rail-UP

Improvement of the quality and safety of cross-border railway connections by works on the line No. 101...

Borders - 5.1

Enhancing transport infrastructure to strengthen Polish-Ukrainian connectivity via road 850 in Lubelskie and H22 in Rivne

Bridge850PL-UA

Enhancing transport infrastructure to strengthen Polish-Ukrainian connectivity via road 850 in Lubelskie...

Accessibility - 6.1

Improving cross-border mobility by building the regional road no. 627 Kosów Lacki – Sokołów Podlaski and general renovation of the bridge in Terebovlia on M-19 national road

SafeRoad4All

Improving cross-border mobility by building the regional road no. 627 Kosów Lacki – Sokołów Podlaski...

Accessibility - 6.1

Development of cross-border mobility: improving the accessibility of road infrastructure in Lviv, Ivano-Frankivsk, Zakarpattya and Podkarpackie regions

DriveConnect

Development of cross-border mobility: improving the accessibility of road infrastructure in Lviv, Ivano-Frankivsk,...

Accessibility - 6.1

Developing cross-border availability and mobility of road infrastructure of the Podlaskie Voivodship and the Volyn Region

CrossBorderRoads

Developing cross-border availability and mobility of road infrastructure of the Podlaskie Voivodship...

Accessibility - 6.1

Cooperation beyond borders – Small Projects Fund on the Polish-Ukrainian border

SmallCBB

Cooperation beyond borders – Small Projects Fund on the Polish-Ukrainian border

Cooperation - 4.1

Protecting the biodiversity of cross-border territories of Ukraine and Poland from invasive hogweed (Heracleum) populations

ZeroHeracleum

Protecting the biodiversity of cross-border territories of Ukraine and Poland from invasive hogweed (Heracleum)...

Environment - 1.3

Biodiversity in the green infrastructure of the Bialystok County and the city of Uzhhorod

BioGreenInfra

Biodiversity in the green infrastructure of the Bialystok County and the city of Uzhhorod

Environment - 1.3

Joint actions to improve cooperation in preventing natural disasters and climate threats in the cross-border area of Poland and Ukraine

FirePrev

Joint actions to improve cooperation in preventing natural disasters and climate threats in the cross-border...

Environment - 1.1

Firefighters volunteers on guard of the environment. Cross-border actions to prevent the effects of climate change

FireFighters

Firefighters volunteers on guard of the environment. Cross-border actions to prevent the effects of climate...

Environment - 1.1